Cell thermal runaway
When a cell goes into thermal runaway at any point in its service life, its surface temperature must be above 90 °C. After thermal runaway the cell must not catch fire or explode, and must not rupture anywhere other than its explosion-proof valve or pressure relief point.
Module thermal runaway propagation
- Carry out the initialisation charge of the battery module.
- Trigger thermal runaway in a single cell, the trigger object, by overcharge or heating. Heat generated by the trigger object should pass easily to the adjacent cells.
- Overcharge trigger: charge at a constant current of at least 1/3 C, or not more than the maximum operating current, until thermal runaway occurs or 200 % SOC is reached. Adjacent cells must not be overcharged. If thermal runaway does not occur, observe for a further 1 h.
- Heating trigger: heat continuously at the heater's maximum power, and stop when thermal runaway occurs or the monitoring point reaches 300 °C. If thermal runaway does not occur, observe for a further 1 h.
- Record the test results.
How it relates to UL 9540A
Both trigger thermal runaway by heating and other means, but for different purposes: GB/T 36276 is a product safety test with pass/fail criteria, while UL 9540A is a test method that provides fire data for installation approval. Where a project needs results for both export and the Chinese market, the samples and trigger methods can be planned together.
Our accredited scope
| Accreditation | Standard | Test items |
|---|---|---|
| CNAS | GB/T 36276-2023 Lithium-ion batteries for electrical energy storage (China) |
|
| CMA | GB/T 36276-2023 Lithium-ion batteries for electrical energy storage (China) |
|
From our CNAS accreditation scope and our CMA approval (China's mandatory approval for inspection and testing bodies, needed for reports used in mainland China), as of 2026-10. Items not listed are outside the scope; ask our engineers whether they can be tested.
Through our partner laboratory
| Standard | Test items |
|---|---|
| GB/T 36276-2023 Lithium-ion batteries for electrical energy storage (electrical performance) |
|
These tests are carried out by a Huahui strategic partner laboratory that holds the relevant CMA approval in China. They are outside Huahui’s own CNAS / CMA scope. Ask our engineers about specimen size, current, voltage and other conditions.
Frequently asked questions
How is thermal runaway of a cell determined?
The indicators are a voltage drop in the test object, the temperature at a monitoring point reaching the battery protection temperature, and a temperature rise rate at a monitoring point of at least 1 °C/s. Thermal runaway is deemed to have occurred when a voltage drop and that rise rate occur together, or when the protection temperature is reached together with that rise rate. Fire or explosion during heating or within 1 hour after heating ends is also judged as thermal runaway.
Can you test electrical performance, such as initial charge/discharge and cycling?
Yes. Initial charge/discharge, power, rate, energy retention and recovery, high- and low-temperature adaptability, high altitude, storage, cycling, cyclic damp heat and alarm/protection tests are carried out by a Huahui strategic partner laboratory (see Through our partner laboratory below). Thermal runaway and the other safety tests are carried out at Huahui.