Fire safety requirements for the cabin (clause 9.1)
| Clause | Requirement | Test |
|---|---|---|
| 9.1.4 | Thermal conductivity of cabin materials | Thermal conductivity test |
| 9.1.5 | Fire resistance of cabin structural materials at least 1 h | Fire resistance test of building elements (GB/T 9978) |
| 9.1.6 | Fire resistance of partitions at least 1 h | Fire resistance test of building elements (GB/T 9978) |
| 9.1.7 | Insulation, ducts, air outlets, valves and similar components to GB 8624 class A; floor coverings and decorative materials class B1 or better | GB/T 5464, GB/T 14402, GB/T 20284, GB/T 8626 and others |
| 9.1.8 | Fire-stopping materials meet the reaction-to-fire, fire resistance and physical and chemical property requirements of GB 23864 | GB 23864 |
The standard has been in force since 1 December 2024.
Thermal runaway propagation test (clause 10.27)
Thermal runaway of a battery is triggered inside the cabin, and the test assesses whether it propagates. Huahui's accreditation scope is limited to DC energy storage cabins.
How it relates to export requirements
The cabin fire resistance requirements of GB/T 44026 address the same kind of question as the requirements that AHJs (authorities having jurisdiction) set for the enclosures of energy storage cabins and data centre containers exported to North America. Huahui can test the same wall panel construction separately to GB/T 9978, UL 263 and EN 1364-1; see fire resistance of BESS enclosures and data centre modules.
Our accredited scope
| Accreditation | Standard | Test items |
|---|---|---|
| CNAS | GB/T 44026-2024 Technical specification for prefabricated-cabin lithium-ion battery energy storage systems (China) |
|
| CMA | GB/T 44026-2024 Technical specification for prefabricated-cabin lithium-ion battery energy storage systems (China) |
|
From our CNAS accreditation scope and our CMA approval (China's mandatory approval for inspection and testing bodies, needed for reports used in mainland China), as of 2026-10. Items not listed are outside the scope; ask our engineers whether they can be tested.
Frequently asked questions
How is the 1-hour fire resistance of a prefabricated cabin tested?
The cabin structural materials and the partitions are given fire resistance tests to the building element fire resistance test methods (GB/T 9978 series), and must achieve at least 1 h. Huahui can build specimens to the actual construction of the cabin wall panels, joints included.
Which materials inside the cabin must be class A?
Insulation materials, and the ducts, air outlets, valves and other components of the ventilation and air-conditioning systems, need a GB 8624 class A reaction-to-fire report. Floor coverings and decorative materials need class B1 or better.