Quyang County, Baoding, Hebei Province

Hebei large-scale fire test site

An outdoor site in a mountain valley built for full-scale fires of battery energy storage cabinets (10–20 MW) and containers (20–40 MW), with an 18 m × 13 m exhaust hood, 60 t lifting and remote observation. Co-built with Baoding Aidi New Energy.

Purpose

The Hebei site was built for one job: burning full-size energy storage systems safely and measuring everything. It sits in Lingshan Town, Quyang County, enclosed by mountains on three sides — a natural barrier for long, high-risk tests — on an industrial plot with the permits that large burns need. It was co-built by Huahui Fire and Baoding Aidi New Energy.

What it tests

  • Outdoor energy storage cabinets with an estimated peak heat release of 10–20 MW, under extreme thermal runaway and fire scenarios based on UL and NFPA requirements.
  • BESS containers of 20–40 MW: full-scale fire tests with a large calorimeter, meeting NFPA 855 large-scale fire testing requirements.
  • Electric vehicles: battery fire tests of complete vehicles.
  • Planned: an indoor-scenario rack array test area for ESS installed in rooms.

Instrumentation

SystemSpecification
Thermal runaway heatingPLC-controlled ramp or constant power; 10 DC supplies (0–500 V, 0–10 A, 1.5 kW each), film, silicone, mica or ceramic heaters up to 300 °C
Temperature180 channels, 16-bit, 0–1370 °C
Heat fluxWater-cooled gauges: 2 × 5 kW/m², 4 × 10 kW/m², 4 × 20 kW/m²; up to 16 at once
GasOnline O₂, CO, CO₂ (infrared), H₂ (Pd-Ni), FTIR (500–4500 cm⁻¹, 1 cm⁻¹); grab samples for GC-MS
Pressure0–15 psia absolute sensors, 20 kHz acquisition
Gas velocityDual-channel S-type pitot tubes, 0–500 Pa differential pressure
IgnitionRemote igniter with mass-flow-controlled burner for heat release calibration
Video2 HD, 2 thermal imaging, 1 high-speed camera, 4 site cameras
Charging2,000 V / 300 A two-channel charge–discharge cabinet for SOC conditioning

Witnessing and logistics

The monitoring room sits more than 30 m from the specimen, with dual power supplies for 24–48 h operation. The client observation room, about 800 m away in the office building, shows live data and video on a large screen and can stream to remote witnesses. Sample storage, pre-conditioning to 100 % SOC, accommodation and a canteen support long test campaigns on site.

Talk to an engineer

Tell us what you need to test

Describe the product, target market and standards. An engineer will get back to you shortly.